<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<!--

  "This web page is actually a data file that is meant to be read by RSS reader programs.
  One way to get an RSS (Really Simple Syndication) Reader is to update your browser.
  
  The latest versions of Firefox, Safari, Internet Explorer, Opera all have RSS Readers."
  
  ERIKS UK Web Services

-->
  <channel>
    <title>ERIKS Case Studies</title>
    <link>http://www.eriks.co.uk</link>
    <description>Case Studies from ERIKS</description>
    <language>en-us</language>
    <copyright>&#169; Copyright 2012 ERIKS Industrial Services
       All Rights Reserved.</copyright>
    <lastBuildDate>Sat, 4 Feb 2012 16:20:40 GMT</lastBuildDate>
    <ttl>20</ttl>
    <atom:link href="http://eriks.co.uk/casestudies/cs-rss.asp" rel="self" type="application/rss+xml" />
<item><title>Imminent bearing failure averted by Revolvo</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_534.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_534.pdf</guid><description>A customer within the quarrying sector contacted their local ERIKS Service Centre with an enquiry for a large 280mm shaft diameter split rol...</description><pubDate>Tue, 24 Jan 2012 00:00:00 GMT</pubDate><category>Imminent bearing failure averted by Revolvo</category></item><item><title>SRB Plummer Block Housings from Revolvo Reduce Failures</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_533.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_533.pdf</guid><description>A customer in the aggregate processing industry had been experiencing on-going bearing failures due to heavy soil &amp; water ingress. The a...</description><pubDate>Mon, 23 Jan 2012 00:00:00 GMT</pubDate><category>SRB Plummer Block Housings from Revolvo Reduce Failures</category></item><item><title>Full Contact Sealing Arrangement on SRB Bearings Prolongs Life</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_532.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_532.pdf</guid><description>A customer within the drink industry was increasingly experiencing issues with bearing failures on a kiln fan - an integral part of the ...</description><pubDate>Mon, 23 Jan 2012 00:00:00 GMT</pubDate><category>Full Contact Sealing Arrangement on SRB Bearings Prolongs Life</category></item><item><title>Maintenance Issues Significantly Reduced with SRB</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_531.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_531.pdf</guid><description>A vertical bucket elevator transferring malt into a germinating vessel was causing major issues when stoppages occurred due to bearing failu...</description><pubDate>Mon, 23 Jan 2012 00:00:00 GMT</pubDate><category>Maintenance Issues Significantly Reduced with SRB</category></item><item><title>Exceptional Sealing Arrangement Extends Bearing Life</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_530.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_530.pdf</guid><description>One of four cool gas air fans on site at a customer in the steel manufacturing industry was having repeat issues with premature bearing fail...</description><pubDate>Mon, 23 Jan 2012 00:00:00 GMT</pubDate><category>Exceptional Sealing Arrangement Extends Bearing Life</category></item><item><title>Maintenance Schedules Dramatically Reduced</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_528.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_528.pdf</guid><description>A customer in the aggregate industry was experience bearing failures on the main drive drum of their primary conveyor which transported aggr...</description><pubDate>Fri, 20 Jan 2012 00:00:00 GMT</pubDate><category>Maintenance Schedules Dramatically Reduced</category></item><item><title>Late Penalty Fines Resolved With Revolvo Split Roller Bearings</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_527.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_527.pdf</guid><description>A customer at a distribution depot for the aggregate industry was experience bearing failures on a conveyor belt bogey, which transfers ...</description><pubDate>Fri, 20 Jan 2012 00:00:00 GMT</pubDate><category>Late Penalty Fines Resolved With Revolvo Split Roller Bearings</category></item><item><title>Costly Downtime Slashed with Revolvo SRB Bearings</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_526.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_526.pdf</guid><description>A customer within the steel industry sector had an on-going issue with Plummer block mounted bearings which supported a reverse fan and ...</description><pubDate>Fri, 20 Jan 2012 00:00:00 GMT</pubDate><category>Costly Downtime Slashed with Revolvo SRB Bearings</category></item><item><title>Revolvo Plummer Block Improves Reliability</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_525.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_525.pdf</guid><description>A customer in the food industry were experiencing regular problems when changing existing plummer block arranged bearings on a fan applicati...</description><pubDate>Fri, 20 Jan 2012 00:00:00 GMT</pubDate><category>Revolvo Plummer Block Improves Reliability</category></item><item><title>RX Oil Transfer Unit Reduces Site Maintenance Costs</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_427.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_427.pdf</guid><description>Envopak have an annual contract with a local mobile oil filtration company. This was scheduled in as a quarterly visit at 8030 per ann...</description><pubDate>Thu, 20 Oct 2011 00:00:00 GMT</pubDate><category>RX Oil Transfer Unit Reduces Site Maintenance Costs</category></item><item><title>Emerson Servo Unit repaired by ERIKS</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_394.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_394.pdf</guid><description>The Lachausee Linking Machine in the loading area at alarge defence company was constantly tripping out on the torque limit.  This was creat...</description><pubDate>Fri, 30 Sep 2011 00:00:00 GMT</pubDate><category>Emerson Servo Unit repaired by ERIKS</category></item><item><title>Upgraded Pump Technology Reduces Energy Consumption</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_235.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_235.pdf</guid><description>A car component manufacturing plant was using an old design Aro Pro series air operated diaphragm pump on a chemical transfer application.&amp;lt;B...</description><pubDate>Sun, 20 Feb 2011 00:00:00 GMT</pubDate><category>Upgraded Pump Technology Reduces Energy Consumption</category></item><item><title>Pressure Booster Solution Provides Cost Saving</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_231.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_231.pdf</guid><description>A food manufacturer was operating an existing wash down system which consisted of two 5.5kW multistage centrifugal pumps. One pump was runni...</description><pubDate>Sun, 20 Feb 2011 00:00:00 GMT</pubDate><category>Pressure Booster Solution Provides Cost Saving</category></item><item><title>Fenner Reliability Crucial for Conveying Application</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_467.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_467.pdf</guid><description>Nestle were installing a new Vortex Robotic Automatic Loading System and Packaging Line into their Fawdon Works. Confectionary such as Jelly...</description><pubDate>Thu, 15 Dec 2011 00:00:00 GMT</pubDate><category>Fenner Reliability Crucial for Conveying Application</category></item><item><title>Energy Savings on Wash-down Process</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_233.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_233.pdf</guid><description>A pharmaceutical plant in the North East were looking to reduce energy costs, while carrying out a site survey we identified a process w...</description><pubDate>Sun, 20 Feb 2011 00:00:00 GMT</pubDate><category>Energy Savings on Wash-down Process</category></item><item><title>Vibration Analysis Pinpoints Problem</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_444.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_444.pdf</guid><description>ERIKS condition monitoring team received a call from a large pharmaceutical manufacturing company asking for an urgent vibration analys...</description><pubDate>Mon, 14 Nov 2011 00:00:00 GMT</pubDate><category>Vibration Analysis Pinpoints Problem</category></item><item><title>Water Wastage Solved with New Pump Solution</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_407.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_407.pdf</guid><description>A large food and drink customer was using cooling water on their vacuum pump system with the water being sent to drain. With the water not b...</description><pubDate>Mon, 10 Oct 2011 00:00:00 GMT</pubDate><category>Water Wastage Solved with New Pump Solution</category></item><item><title>Unqiue pneumatic solution</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_398.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_398.pdf</guid><description>ERIKS Fluid Power were asked to look at an application from a local company to come up with some design to punch out connecting parts from p...</description><pubDate>Thu, 6 Oct 2011 00:00:00 GMT</pubDate><category>Unqiue pneumatic solution</category></item><item><title>Obsolete Water Cooling Pumps Replaced With Efficient Solution</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_301.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_301.pdf</guid><description>The customer, a large steel manufacturer, had a split case of cooling water pumps that dated back to the 1960s. The requirements of ...</description><pubDate>Thu, 19 May 2011 00:00:00 GMT</pubDate><category>Obsolete Water Cooling Pumps Replaced With Efficient Solution</category></item><item><title>Energy Efficient Solution Designs Out Obsolete Pumps</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_300.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_300.pdf</guid><description>The current installed pumps were approx 50 years old and had been obsolete for the last 25 years. They had also tried an off the shelf verti...</description><pubDate>Thu, 19 May 2011 00:00:00 GMT</pubDate><category>Energy Efficient Solution Designs Out Obsolete Pumps</category></item><item><title>Cavitation Damage to Impellers</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_299.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_299.pdf</guid><description>The original pump units were unreliable; they were experiencing severe &amp;quot;cavitation&amp;quot; damage to the impellers. The resultant damage wa...</description><pubDate>Thu, 19 May 2011 00:00:00 GMT</pubDate><category>Cavitation Damage to Impellers</category></item><item><title>Efficient Pump Solution Saves Thousands</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_242.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_242.pdf</guid><description>A printing company currently use 6no. Becker dry vane pumps providing vacuum to envelop machines.The pumps/system were advised as adequate b...</description><pubDate>Sun, 20 Feb 2011 00:00:00 GMT</pubDate><category>Efficient Pump Solution Saves Thousands</category></item><item><title>Pump Solution Prevents Costly Downtime</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_234.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_234.pdf</guid><description>A food manufacturing site used a 2&amp;quot; Blagdon air operated pump for pumping sludge. The pump was prone to repeated failure, blockages ...</description><pubDate>Sun, 20 Feb 2011 00:00:00 GMT</pubDate><category>Pump Solution Prevents Costly Downtime</category></item><item><title>Energy Savings Provided by ERIKS Pump Solution</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_232.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_232.pdf</guid><description>A pharmaceutical plant in the North East were looking to reduce energy costs. A survey of the plant was carried out and there were a number ...</description><pubDate>Sun, 20 Feb 2011 00:00:00 GMT</pubDate><category>Energy Savings Provided by ERIKS Pump Solution</category></item><item><title>Best Practice Principles from ERIKS</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_203.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_203.pdf</guid><description>A large food customer was struggling with a lack of knowledge on the Grundfos CR range of pumps, particulary when it came to repair and ...</description><pubDate>Mon, 31 Jan 2011 00:00:00 GMT</pubDate><category>Best Practice Principles from ERIKS</category></item><item><title>Pump Training Reduces Plant Failures</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_191.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_191.pdf</guid><description>ERIKS work closely with a large cereal manufacturer, as part of this relationship it was agreed that ERIKS would undertake a Grundfos pu...</description><pubDate>Mon, 31 Jan 2011 00:00:00 GMT</pubDate><category>Pump Training Reduces Plant Failures</category></item><item><title>System Re-design Improves Reliability</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_402.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_402.pdf</guid><description>Delphi Diesel had several issues with the cam operators on a Voumard machine. The problem was hydraulic and this was causing oily atmosphere...</description><pubDate>Fri, 7 Oct 2011 00:00:00 GMT</pubDate><category>System Re-design Improves Reliability</category></item><item><title>Illuminated Solutions from ERIKS</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_397.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_397.pdf</guid><description>Blackpool council maintain the famous lights and machines in the &amp;quot;illumination&amp;quot; show at Blackpool sea front  On a particular tableau...</description><pubDate>Thu, 6 Oct 2011 00:00:00 GMT</pubDate><category>Illuminated Solutions from ERIKS</category></item><item><title>Pump Modifications Improve Performance</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_230.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_230.pdf</guid><description>A local salt mine currently use the B series Flygt submersible pumps in drainage applications throughout the mine network. A normal installa...</description><pubDate>Sun, 20 Feb 2011 00:00:00 GMT</pubDate><category>Pump Modifications Improve Performance</category></item><item><title>ERIKS Know-How Averts Environmental Pollution</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_229.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_229.pdf</guid><description>A local water authority required an urgent repair on an obsolete Weir Swallowglide pump. The pump was installed in a critical pumping statio...</description><pubDate>Sun, 20 Feb 2011 00:00:00 GMT</pubDate><category>ERIKS Know-How Averts Environmental Pollution</category></item><item><title>Automatic Lubricators from Simatec Simplfy Maintenance</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_428.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_428.pdf</guid><description>Thomas Hardy a brewery and bottling plant had a bank of grease nipples to lubricate numerous moving parts on their bottling filler. These al...</description><pubDate>Fri, 21 Oct 2011 00:00:00 GMT</pubDate><category>Automatic Lubricators from Simatec Simplfy Maintenance</category></item><item><title>ERIKS Know-How Reduces Inventory and Overall Costs</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_410.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_410.pdf</guid><description>ERIKS received a large number of orders for chain to be sourced from KRUPPS in order to support the new B6 assembly line on-site at a la...</description><pubDate>Mon, 10 Oct 2011 00:00:00 GMT</pubDate><category>ERIKS Know-How Reduces Inventory and Overall Costs</category></item><item><title>Pump repair for sprinkler system</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_228.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_228.pdf</guid><description>A pharmaceutical plant operate a fire sprinkler system which relies on a Mather and Platt split case pump. The pump had failed and another s...</description><pubDate>Sun, 20 Feb 2011 00:00:00 GMT</pubDate><category>Pump repair for sprinkler system</category></item><item><title>Urgent Pump Repair</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_227.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_227.pdf</guid><description>A manufacturer of machine parts operate 2 no. SPP end suction centrifugal pumps on a cooling water system. One pump had failed previously an...</description><pubDate>Sun, 20 Feb 2011 00:00:00 GMT</pubDate><category>Urgent Pump Repair</category></item><item><title>Energy savings advice</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_225.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_225.pdf</guid><description>A plastic pipe manufacturer currently has six no. SPP end suction centrifugal pumps installed on site and used on three different water appl...</description><pubDate>Sun, 20 Feb 2011 00:00:00 GMT</pubDate><category>Energy savings advice</category></item><item><title>Superior Service Life with Fenner Ultra PLUS 140</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_447.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_447.pdf</guid><description>A specialist paper manufacturer, in the North East of England was experiencing regular failures of belt drives fitted to a piece of equi...</description><pubDate>Wed, 16 Nov 2011 00:00:00 GMT</pubDate><category>Superior Service Life with Fenner Ultra PLUS 140</category></item><item><title>Quicker Installation, Superior Sealing</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_446.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_446.pdf</guid><description>A large dry bulk terminal in Rotterdam which specialises in the unloading and storage of coal and iron-ore were experiencing reliability...</description><pubDate>Wed, 16 Nov 2011 00:00:00 GMT</pubDate><category>Quicker Installation, Superior Sealing</category></item><item><title>Revolvo Split Roller Bearings Cut Downtime</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_445.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_445.pdf</guid><description>A large petro-chemical company based in Antwerp were experiencing prolonged downtime with bearing failures on their cooling tower fans. ...</description><pubDate>Wed, 16 Nov 2011 00:00:00 GMT</pubDate><category>Revolvo Split Roller Bearings Cut Downtime</category></item><item><title>Premature Pump Failures Solved</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_408.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_408.pdf</guid><description>A customer was using Flygt mixer pumps to mix and pump factory effluent, however the pumps were failing at a rate of approximately three...</description><pubDate>Mon, 10 Oct 2011 00:00:00 GMT</pubDate><category>Premature Pump Failures Solved</category></item><item><title>Inverter Driven Pump Set Solution</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_425.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_425.pdf</guid><description>A customer had installed a fixed speed end suction centrifugal pump set. The pump set is not variable and is wasting energy when the process...</description><pubDate>Wed, 12 Oct 2011 00:00:00 GMT</pubDate><category>Inverter Driven Pump Set Solution</category></item><item><title>ERIKS Design Out On-Going Pump Problems</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_419.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_419.pdf</guid><description>An ERIKS customer was experiencing on-going problems on one of his applications -  a Flygt submersible installed in his effluent pit...</description><pubDate>Tue, 11 Oct 2011 00:00:00 GMT</pubDate><category>ERIKS Design Out On-Going Pump Problems</category></item><item><title>RX Cylinders Provide Cost Effective Solutions</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_404.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_404.pdf</guid><description>A large printing company were buying four special OEM cylinders direct from the manufacturer with a protected part number that was only avai...</description><pubDate>Fri, 7 Oct 2011 00:00:00 GMT</pubDate><category>RX Cylinders Provide Cost Effective Solutions</category></item><item><title>Panel Redesign &amp; Installation Prevents Downtime</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_438.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_438.pdf</guid><description>A company specialising in slurry equipment solutions, have several filling machines which coat slip onto the moulds produced w...</description><pubDate>Mon, 31 Oct 2011 00:00:00 GMT</pubDate><category>Panel Redesign &amp; Installation Prevents Downtime</category></item><item><title>Solvent solutions from ERIKS</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_316.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_316.pdf</guid><description>A common solvent used in the process of blade cleaning is mixed with vegatable oil to stop the oil turning hard, thus lubricating the bl...</description><pubDate>Fri, 27 May 2011 00:00:00 GMT</pubDate><category>Solvent solutions from ERIKS</category></item><item><title>Seal Redesign Prevents Food Contamination</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_442.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_442.pdf</guid><description>The customer had a seal failure and a quality issue. A seal had failed in a screw conveyor, resulting in the possibility that the seal s...</description><pubDate>Wed, 2 Nov 2011 00:00:00 GMT</pubDate><category>Seal Redesign Prevents Food Contamination</category></item><item><title>Reducing leakage by 50 tonnes per year</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_441.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_441.pdf</guid><description>Everything leaks,even gaskets! It is the rate of this leak what is critical.The lower the leak, the less the financial loss ...</description><pubDate>Wed, 2 Nov 2011 00:00:00 GMT</pubDate><category>Reducing leakage by 50 tonnes per year</category></item><item><title>RX Pneumatics Prove Their Quality</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_430.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_430.pdf</guid><description>A pallet manufacturing site in Manchester had a large spend on pneumatic products. Although ERIKS had worked with the customer in the past t...</description><pubDate>Fri, 28 Oct 2011 00:00:00 GMT</pubDate><category>RX Pneumatics Prove Their Quality</category></item><item><title>Pump Fan Inverter Saves Energy</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_439.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_439.pdf</guid><description>A UK major weapons manufacturer had a project for the forced draft fan motors to be controlled using inverters - to allow improved contr...</description><pubDate>Tue, 1 Nov 2011 00:00:00 GMT</pubDate><category>Pump Fan Inverter Saves Energy</category></item><item><title>Air Diaphragm Pump Consumes 40% Less Air</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_204.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_204.pdf</guid><description>A customer had two Wildon Air Diaphragm pumps which had now reached the end of their economical working life and needed to be replaced. The ...</description><pubDate>Mon, 31 Jan 2011 00:00:00 GMT</pubDate><category>Air Diaphragm Pump Consumes 40% Less Air</category></item><item><title>Obsolete PLC Redesigned Provide Cost Savings</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_196.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_196.pdf</guid><description>Maintenance had highlighted that the PLC within the cabinet on the main Furnace was obsolete, and spare parts were not available on the ...</description><pubDate>Mon, 31 Jan 2011 00:00:00 GMT</pubDate><category>Obsolete PLC Redesigned Provide Cost Savings</category></item><item><title>Air Leak Surveys Identify Huge Savings</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_414.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_414.pdf</guid><description>As a result of multiple air leaks highlighted by Polestar Chantry ERIKS were approached to assist Polestar to help alleviate the problems.&amp;lt;b...</description><pubDate>Tue, 11 Oct 2011 00:00:00 GMT</pubDate><category>Air Leak Surveys Identify Huge Savings</category></item><item><title>Fenner Ultra PLUS 140 Restores Fan Efficiency</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_396.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_396.pdf</guid><description>A large cement works had a problem with the fans drives on their bag filters. They were old Poly V drives and needed new pulleys and belts.&amp;lt;...</description><pubDate>Thu, 6 Oct 2011 00:00:00 GMT</pubDate><category>Fenner Ultra PLUS 140 Restores Fan Efficiency</category></item><item><title>Driving Down Energy Costs with Fenner Gearboxes</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_265.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_265.pdf</guid><description>A conveyor driven by an old worm gearbox, belt drive and electric motor was starting to show signs of wear after a number of years in se...</description><pubDate>Tue, 1 Mar 2011 00:00:00 GMT</pubDate><category>Driving Down Energy Costs with Fenner Gearboxes</category></item><item><title>Motor failure reduced</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_353.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_353.pdf</guid><description>A large dairy products producer were concerned about the premature failures of a recently repaired 30KW motor, an ERIKS EMS (Electro...</description><pubDate>Thu, 11 Aug 2011 00:00:00 GMT</pubDate><category>Motor failure reduced</category></item><item><title>ERIKS puts the crunch on Walkers blow gun overspend</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_409.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_409.pdf</guid><description>The Leicester site of a major crisps manufacturer had been forking out 26,000 each year on Silvent blow guns.

ERIKS was...</description><pubDate>Mon, 10 Oct 2011 00:00:00 GMT</pubDate><category>ERIKS puts the crunch on Walkers blow gun overspend</category></item><item><title>Lead time on pneumatic avoided</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_403.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_403.pdf</guid><description>An Engineer from a large automotive manufacturer contacted ERIKS when they had an issue on a lead time for a Parker part. The quoted lead ti...</description><pubDate>Fri, 7 Oct 2011 00:00:00 GMT</pubDate><category>Lead time on pneumatic avoided</category></item><item><title>Bearing peace of mind</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_348.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_348.pdf</guid><description>A large power generation customer found several large Torrington Taper Bearings in their stores, which they estimated had been there for...</description><pubDate>Wed, 10 Aug 2011 00:00:00 GMT</pubDate><category>Bearing peace of mind</category></item><item><title>Vertical Multi Stage Pump</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_244.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_244.pdf</guid><description>A manufacturer of kitchen furniture contacted their local ERIKS branch to request assistance with sourcing a replacement to an obsolete vert...</description><pubDate>Sun, 20 Feb 2011 00:00:00 GMT</pubDate><category>Vertical Multi Stage Pump</category></item><item><title>Regional Thermal Imaging Seminars</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_296.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_296.pdf</guid><description>Several customers in the North West had expressed an interest for ERIKS to visit their sites to discuss thermal imaging and look at the vari...</description><pubDate>Tue, 26 Apr 2011 00:00:00 GMT</pubDate><category>Regional Thermal Imaging Seminars</category></item><item><title>Compact Drive Arrangement Solved with Fenner Cyclo</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_426.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_426.pdf</guid><description>As part of a project to upgrade a Treatment Works north of Glasgow, primary and secondary tanks were to be refurbished. The three second...</description><pubDate>Thu, 20 Oct 2011 00:00:00 GMT</pubDate><category>Compact Drive Arrangement Solved with Fenner Cyclo</category></item><item><title>ERIKS Coupling Centre Save the Day</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_405.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_405.pdf</guid><description>The local ERIKS Service Centre received a call from a large quarrying customer based in at Meriden requiring assistance on a breakdown for a...</description><pubDate>Fri, 7 Oct 2011 00:00:00 GMT</pubDate><category>ERIKS Coupling Centre Save the Day</category></item><item><title>Frenzelit seals boiler drum doors</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_393.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_393.pdf</guid><description>IP and LP Steam boiler drum doors on a CHP power station were suffering steam leakage issues. Not only was this costly, it was also a He...</description><pubDate>Wed, 28 Sep 2011 00:00:00 GMT</pubDate><category>Frenzelit seals boiler drum doors</category></item><item><title>Health and Safety Issue resolved</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_387.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_387.pdf</guid><description>A large Quorn Food manufacturer was experiencing a Health and Safety issue on one of their dispensing machines. The camlock couplings and th...</description><pubDate>Mon, 26 Sep 2011 00:00:00 GMT</pubDate><category>Health and Safety Issue resolved</category></item><item><title>Food plant oil leak solved by ERIKS know-how</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_371.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_371.pdf</guid><description>A food manufacturing plant had an issue with seven 22kw motors and gearboxes leaking up to 2.5l of oil each month. 

The units wer...</description><pubDate>Wed, 7 Sep 2011 00:00:00 GMT</pubDate><category>Food plant oil leak solved by ERIKS know-how</category></item><item><title>Failed Metal Polishing Line Motor</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_297.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_297.pdf</guid><description>A customer had failure on the metal polishing line motor (30Kw) and placed an order with a local supplier for a replacement that pro...</description><pubDate>Sat, 30 Apr 2011 00:00:00 GMT</pubDate><category>Failed Metal Polishing Line Motor</category></item><item><title>Dedicated Coupling Expertise In-House</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_400.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_400.pdf</guid><description>A major international company operating in the power generation industry were undertaking a refurbishment of a CCGT Power Station in the UK....</description><pubDate>Thu, 6 Oct 2011 00:00:00 GMT</pubDate><category>Dedicated Coupling Expertise In-House</category></item><item><title>Fenner Reliability Solves On-Going Problem</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_399.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_399.pdf</guid><description>A major Water Utility Company was experiencing serious reliability issues with six variable speed worm gear motor units, installed in a ...</description><pubDate>Thu, 6 Oct 2011 00:00:00 GMT</pubDate><category>Fenner Reliability Solves On-Going Problem</category></item><item><title>Pneumatic Problems Solved During Shutdown</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_389.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_389.pdf</guid><description>A number of lines at a pet food manufacturer in Wisbech were being overhauled during their regular two-week shutdown period. It was duri...</description><pubDate>Wed, 28 Sep 2011 00:00:00 GMT</pubDate><category>Pneumatic Problems Solved During Shutdown</category></item><item><title>Fenner Dry Fit Adaptor System Reduces Downtime</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_347.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_347.pdf</guid><description>A large glass manufacturer in Doncaster contacted the service centre with the problem on a competitors  geared motor unit on their paletizer...</description><pubDate>Wed, 10 Aug 2011 00:00:00 GMT</pubDate><category>Fenner Dry Fit Adaptor System Reduces Downtime</category></item><item><title>Specially Sourced Belts Increase Production</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_328.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_328.pdf</guid><description>A customer was experiencing problems with twin A section coated belts, they were currently being sourced from the USA but didnt have a s...</description><pubDate>Mon, 27 Jun 2011 00:00:00 GMT</pubDate><category>Specially Sourced Belts Increase Production</category></item><item><title>Inverter Solution Increases Plant Efficiency</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_264.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_264.pdf</guid><description>Following a discussion with the on-site engineer at a local quarry, ERIKS were invited on-site to inspect a 240kW dryer exhaust ...</description><pubDate>Tue, 1 Mar 2011 00:00:00 GMT</pubDate><category>Inverter Solution Increases Plant Efficiency</category></item><item><title>Bespoke Chain Solution Delivers Savings</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_317.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_317.pdf</guid><description>A large company is involved in the specialist anodising industry.  As part of the manufacturing process there is a Bi-Planar chain which...</description><pubDate>Fri, 27 May 2011 00:00:00 GMT</pubDate><category>Bespoke Chain Solution Delivers Savings</category></item><item><title>Constant Torque Inverter for Crane Hoist</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_374.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_374.pdf</guid><description>As a result of a recent visit to a large steel manufacturer, ERIKS were requested by senior plant engineers to assist in the urgent repl...</description><pubDate>Thu, 8 Sep 2011 00:00:00 GMT</pubDate><category>Constant Torque Inverter for Crane Hoist</category></item><item><title>Recycling for the Future</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_390.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_390.pdf</guid><description>A West Midlands recycling plant had just installed a new machine, but due to the nature of the business and continuous use of the machin...</description><pubDate>Wed, 28 Sep 2011 00:00:00 GMT</pubDate><category>Recycling for the Future</category></item><item><title>In-house Problem Solving Solutions</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_388.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_388.pdf</guid><description>A Liverpool company who manufacture and refurbish railway rolling stock, successfully won an order to refurbish compressors from an Amer...</description><pubDate>Tue, 27 Sep 2011 00:00:00 GMT</pubDate><category>In-house Problem Solving Solutions</category></item><item><title>Revolvo Split Roller Bearings Rescue Fan Failure</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_380.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_380.pdf</guid><description>A customer in the pet food processing industry historically used pedestal units to support a 75mm shaft on an overhung fan application....</description><pubDate>Tue, 20 Sep 2011 00:00:00 GMT</pubDate><category>Revolvo Split Roller Bearings Rescue Fan Failure</category></item><item><title>Airtight Sealing Solutions from ERIKS </title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_378.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_378.pdf</guid><description>A large diameter hatch in the lower level of a wind turbine application needed an airtight seal. Repeated opening and closing can leave the ...</description><pubDate>Tue, 20 Sep 2011 00:00:00 GMT</pubDate><category>Airtight Sealing Solutions from ERIKS </category></item><item><title>RX Gaskets Meet Project Deadlines</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_377.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_377.pdf</guid><description>An HVAC company who were manufacturing ducting for an industrial installation project required a BS7531 Grade Y Gasket material to joint the...</description><pubDate>Mon, 19 Sep 2011 00:00:00 GMT</pubDate><category>RX Gaskets Meet Project Deadlines</category></item><item><title>Gasket Technology Seals Troublesome Boiler</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_376.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_376.pdf</guid><description>An Industrial Boiler company had an issue with a tanged graphite gasket material which was installed onto an old industrial steam boiler. Th...</description><pubDate>Mon, 19 Sep 2011 00:00:00 GMT</pubDate><category>Gasket Technology Seals Troublesome Boiler</category></item><item><title>Crumpet line oil spill solved by ERIKS</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_375.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_375.pdf</guid><description>A Northern bakery was experiencing problems on its crumpet lines. Oil was put on the tins to stop the dough sticking while going through the...</description><pubDate>Fri, 9 Sep 2011 00:00:00 GMT</pubDate><category>Crumpet line oil spill solved by ERIKS</category></item><item><title>Condition monitoring saves Dairy Crest 10k</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_359.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_359.pdf</guid><description>During the course of Dairy Crests routine condition monitoring programme, an ERIKS engineer detected a homogeniser gearbox and moto...</description><pubDate>Fri, 12 Aug 2011 00:00:00 GMT</pubDate><category>Condition monitoring saves Dairy Crest 10k</category></item><item><title>RX Pneumatic Cylinders do the job</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_340.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_340.pdf</guid><description>A printing customer in Manchester were experiencing failures on several pneumatic cylinders. ERIKS inspected these cylinders to see if they ...</description><pubDate>Mon, 25 Jul 2011 00:00:00 GMT</pubDate><category>RX Pneumatic Cylinders do the job</category></item><item><title>Touch screen repair saves company 5k</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_327.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_327.pdf</guid><description>When a large touch screen was returned to the manufacturers for repair, the report came back they would have to replace it as it wa...</description><pubDate>Mon, 27 Jun 2011 00:00:00 GMT</pubDate><category>Touch screen repair saves company 5k</category></item><item><title>Reduced Downtime with Fenner PowerTwist Belts</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_322.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_322.pdf</guid><description>A newspaper printing company in Manchester were experiencing reliability problems on one of their magazine insertion machines. ...</description><pubDate>Mon, 20 Jun 2011 00:00:00 GMT</pubDate><category>Reduced Downtime with Fenner PowerTwist Belts</category></item><item><title>Hose storage solution for Titanium customer</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_321.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_321.pdf</guid><description>ERIKS had recently supplied the worlds largest supplier of high quality titanium metal products with a Gates Hydraulic Hose self-assembl...</description><pubDate>Thu, 16 Jun 2011 00:00:00 GMT</pubDate><category>Hose storage solution for Titanium customer</category></item><item><title>Seepex pump for potato chopper</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_226.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_226.pdf</guid><description>A food manufacturing site currently has an existing Mono muncher which causes the following problems.&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;
The macerator is not ...</description><pubDate>Sun, 20 Feb 2011 00:00:00 GMT</pubDate><category>Seepex pump for potato chopper</category></item><item><title>Energy Suggestion saves 22,000</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_213.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_213.pdf</guid><description>ERIKS were called into a plastic pipe manufacturer to investigate the energy usage on their cooling water circuit. The manufacturer had six ...</description><pubDate>Mon, 31 Jan 2011 00:00:00 GMT</pubDate><category>Energy Suggestion saves 22,000</category></item><item><title>The Compact, Powerful Solution from Fenner</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_346.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_346.pdf</guid><description>A large steel manufacturer was experiencing on-going problems with one of their drives. The chain drive on a conveyor belt which carries...</description><pubDate>Fri, 5 Aug 2011 00:00:00 GMT</pubDate><category>The Compact, Powerful Solution from Fenner</category></item><item><title>Gasket solves lubrication leaks</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_373.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_373.pdf</guid><description>One of the largest beverage manufacturers in the UK had an issue with lubrication oil leaking from the feeding line and stopping production....</description><pubDate>Wed, 7 Sep 2011 00:00:00 GMT</pubDate><category>Gasket solves lubrication leaks</category></item><item><title>RX Gaskets meet compressor needs</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_372.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_372.pdf</guid><description>A compressor company, who are the leading service and sales provider of Rotary Screw and Rotary Vane Compressors in the North of England...</description><pubDate>Wed, 7 Sep 2011 00:00:00 GMT</pubDate><category>RX Gaskets meet compressor needs</category></item><item><title>ERIKS Explore the Ocean Floor</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_272.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_272.pdf</guid><description>A request was received from a design house in Great Yarmouth to put together a complete drive for launching two observation rigs into the wa...</description><pubDate>Fri, 4 Mar 2011 00:00:00 GMT</pubDate><category>ERIKS Explore the Ocean Floor</category></item><item><title>Renold Syno Chain Dramatically Reduces Downtime</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_267.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_267.pdf</guid><description>A large soft drinks manufacturer were experiencing problems with the chain currently being used on their labelling machine. It was lasting a...</description><pubDate>Wed, 2 Mar 2011 00:00:00 GMT</pubDate><category>Renold Syno Chain Dramatically Reduces Downtime</category></item><item><title>Sedis Delta Z - The Toughest Solution</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_223.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_223.pdf</guid><description>In one food application, stainless steel chains were only lasting about six months before they stretched too much to be used, and we...</description><pubDate>Thu, 17 Feb 2011 00:00:00 GMT</pubDate><category>Sedis Delta Z - The Toughest Solution</category></item><item><title>Fenner Quick Drive Inverters Eradicate Motor Failures</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_368.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_368.pdf</guid><description>A large car manufacturer was experiencing reoccurring failures of the &amp;quot;Micro Inch&amp;quot; motor on a large transfer press. 

The ...</description><pubDate>Fri, 26 Aug 2011 00:00:00 GMT</pubDate><category>Fenner Quick Drive Inverters Eradicate Motor Failures</category></item><item><title>Trouble Free Operation with Renold Synergy Chain</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_222.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_222.pdf</guid><description>A large car manufacturer was experiencing problems with a chain drive application. The chains drive a lifting system for the cars going thro...</description><pubDate>Thu, 17 Feb 2011 00:00:00 GMT</pubDate><category>Trouble Free Operation with Renold Synergy Chain</category></item><item><title>Precise, Efficient Control Helps Reduce the Carbon Footprint</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_369.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_369.pdf</guid><description>The manufacturer of a well known vegetarian meat substitute, uses a lot of cold water for cooling the product during the production proc...</description><pubDate>Fri, 26 Aug 2011 00:00:00 GMT</pubDate><category>Precise, Efficient Control Helps Reduce the Carbon Footprint</category></item><item><title>Downtime reduced with onsite repair</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_334.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_334.pdf</guid><description>A sales person from ERIKS was called to the site of a large Bakery to look at the main Prover gearbox drive.  The prover oven is a warm and ...</description><pubDate>Thu, 30 Jun 2011 00:00:00 GMT</pubDate><category>Downtime reduced with onsite repair</category></item><item><title>Fenner Ultra Plus 140 Wedge belts increase drive life</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_344.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_344.pdf</guid><description>A company producing architectural stone blocks was experiencing issues with bearing life, drive life and accurate driven speed on one of...</description><pubDate>Tue, 2 Aug 2011 00:00:00 GMT</pubDate><category>Fenner Ultra Plus 140 Wedge belts increase drive life</category></item><item><title>Fenner Helical/Bevel Gearboxes </title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_343.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_343.pdf</guid><description>A Midlands company who process meat products for the fast food industry were experiencing problems on one of their production processors whi...</description><pubDate>Tue, 2 Aug 2011 00:00:00 GMT</pubDate><category>Fenner Helical/Bevel Gearboxes </category></item><item><title>Air Motor and Fenner Cyclo Inline Gearbox</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_342.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_342.pdf</guid><description>A reclaim screw on the shot blast machine was running with an air motor and gearbox at a large steel plant in Scunthorpe. Failures were beco...</description><pubDate>Tue, 2 Aug 2011 00:00:00 GMT</pubDate><category>Air Motor and Fenner Cyclo Inline Gearbox</category></item><item><title>Pneumatic know-how ensures cost saving</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_341.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_341.pdf</guid><description>A printing company in Manchester had a failure on several pneumatic cylinders. ERIKS inspected these cylinders to see if they could be sourc...</description><pubDate>Mon, 25 Jul 2011 00:00:00 GMT</pubDate><category>Pneumatic know-how ensures cost saving</category></item><item><title>Low Temperature Seal for Aerospace</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_337.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_337.pdf</guid><description>Design Engineers at a large security, defence, transport and energy company were tasked with providing a sealing solution for a moto...</description><pubDate>Wed, 6 Jul 2011 00:00:00 GMT</pubDate><category>Low Temperature Seal for Aerospace</category></item><item><title>Motor Asset Register</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_335.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_335.pdf</guid><description>A large Steel Manufacturer in Scunthorpe was faced with the onerous task of identifying 1,175 electric motors within two seperate stores...</description><pubDate>Fri, 1 Jul 2011 00:00:00 GMT</pubDate><category>Motor Asset Register</category></item><item><title>Reliable Gasket Supplier</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_333.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_333.pdf</guid><description>A leading car manufacturer was looking to source a competitive, like for like specification product to replace a complacent supplier tha...</description><pubDate>Wed, 29 Jun 2011 00:00:00 GMT</pubDate><category>Reliable Gasket Supplier</category></item><item><title>Biaxial Fibrillated PTFE Gasket</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_332.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_332.pdf</guid><description>An inorganic chemical plant, who supply a specialist range of products made from copper, zinc, tin and iodine for use in advance...</description><pubDate>Wed, 29 Jun 2011 00:00:00 GMT</pubDate><category>Biaxial Fibrillated PTFE Gasket</category></item><item><title>Turbine pipework gaskets</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_331.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_331.pdf</guid><description>One of the UKs major electricity generators was experiencing sealing problems on high temperature, high pressure turbine pipework. ...</description><pubDate>Wed, 29 Jun 2011 00:00:00 GMT</pubDate><category>Turbine pipework gaskets</category></item><item><title>High temperature gaskets solve leaks</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_330.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_330.pdf</guid><description>One of the UKs major electricity generators was experiencing issues with sealing on their high temperature turbine gland steam system. ...</description><pubDate>Wed, 29 Jun 2011 00:00:00 GMT</pubDate><category>High temperature gaskets solve leaks</category></item><item><title>RX Spiral Wound Gaskets prevent future leaks</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_329.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_329.pdf</guid><description>A large power generator contacted ERIKS Gasket Technology when they experienced leakage on their water treatment plant. Water used to cool t...</description><pubDate>Wed, 29 Jun 2011 00:00:00 GMT</pubDate><category>RX Spiral Wound Gaskets prevent future leaks</category></item><item><title>Gear Couplings for shut down</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_315.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_315.pdf</guid><description>A large distribution company based in Hull were in the process of overhauling their nitrogen pump and motor assembly, which provides coo...</description><pubDate>Fri, 27 May 2011 00:00:00 GMT</pubDate><category>Gear Couplings for shut down</category></item><item><title>Obsolete Potentiometers</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_314.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_314.pdf</guid><description>A large nuclear power station was experiencing a problem. They had 50 potentiometers which were in need of repair. The customer looked to bu...</description><pubDate>Fri, 27 May 2011 00:00:00 GMT</pubDate><category>Obsolete Potentiometers</category></item><item><title>Sealing capability ensures replacement product</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_312.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_312.pdf</guid><description>A large Power Generator was experiencing problems with obsolete seals. George Angus, a large seal manufacturer had withdrawn their entir...</description><pubDate>Thu, 26 May 2011 00:00:00 GMT</pubDate><category>Sealing capability ensures replacement product</category></item><item><title>Obsolete Bearings manufactured by Revolvo</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_311.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_311.pdf</guid><description>A large nuclear power station recently contacted ERIKS when it was identified that several of their cylindrical roller bearings were obsolet...</description><pubDate>Thu, 26 May 2011 00:00:00 GMT</pubDate><category>Obsolete Bearings manufactured by Revolvo</category></item><item><title>Obsolete Motor replaced for Nuclear Power Station</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_310.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_310.pdf</guid><description>A large Nuclear Power Station in Bristol encountered a problem with the electric motors on one of the reactor cranes during a scheduled upgr...</description><pubDate>Wed, 25 May 2011 00:00:00 GMT</pubDate><category>Obsolete Motor replaced for Nuclear Power Station</category></item><item><title>Wedge Gate Valves</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_309.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_309.pdf</guid><description>During a walk down at a nuclear power station, ERIKS Valves Core Competence Centre, were asked to assist with the identification of ...</description><pubDate>Wed, 25 May 2011 00:00:00 GMT</pubDate><category>Wedge Gate Valves</category></item><item><title>Electrical Cable repair for Steel manufacturer</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_306.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_306.pdf</guid><description>A large steel manufacturer experienced a problem when a significant electrical cable, which was water cooled, broke at the Ladle Arc...</description><pubDate>Mon, 23 May 2011 00:00:00 GMT</pubDate><category>Electrical Cable repair for Steel manufacturer</category></item><item><title>Quick connect couplings</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_305.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_305.pdf</guid><description>ERIKS UK and Cejn, an independant quick connect coupling and nipple manufacturer, recently worked together to solve a customers prob...</description><pubDate>Mon, 23 May 2011 00:00:00 GMT</pubDate><category>Quick connect couplings</category></item><item><title>Improved OEM component supplied</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_304.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_304.pdf</guid><description>The installed pump unit is a split case horizontal unit and because there was a significant level of silt in the water, the unit had suf...</description><pubDate>Mon, 23 May 2011 00:00:00 GMT</pubDate><category>Improved OEM component supplied</category></item><item><title>Fenner Gearbox solves problems</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_295.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_295.pdf</guid><description>A large quarry were having problems with a motor gearbox driving a conveyor belt carrying stones via a wedge belt and pulley system. The cus...</description><pubDate>Tue, 26 Apr 2011 00:00:00 GMT</pubDate><category>Fenner Gearbox solves problems</category></item><item><title>Transformer Repair for Steel Producer</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_294.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_294.pdf</guid><description>After taking a routine insulating oil sample from a Steel producing customers 3000 KVA transformer, a dissolved gas analysis test w...</description><pubDate>Thu, 14 Apr 2011 00:00:00 GMT</pubDate><category>Transformer Repair for Steel Producer</category></item><item><title>Hot Mill Maintenance</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_293.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_293.pdf</guid><description>A large Steel producing customer had a maintenance down day which took place every five to six weeks at their Newport site. This d...</description><pubDate>Thu, 14 Apr 2011 00:00:00 GMT</pubDate><category>Hot Mill Maintenance</category></item><item><title>RX Spiral Wound Gasket Reduces Blowouts</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_290.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_290.pdf</guid><description>One of ERIKS customers, a polymer processing facility, was using a general duty non asbestos fibre gasket on a reactor vessel blow p...</description><pubDate>Wed, 6 Apr 2011 00:00:00 GMT</pubDate><category>RX Spiral Wound Gasket Reduces Blowouts</category></item><item><title>Superior Gaskets Solve Leakage on Salt Lines</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_289.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_289.pdf</guid><description>The customer, a large producer of titanium and tantalum was experiencing problems with leakage on their salt lines which are a critical ...</description><pubDate>Wed, 6 Apr 2011 00:00:00 GMT</pubDate><category>Superior Gaskets Solve Leakage on Salt Lines</category></item><item><title>Gearbox Repair for Loading Crane</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_288.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_288.pdf</guid><description>The customer, a large steel producer, experienced a failure on a gearbox on their long travel crane in their loading bay. The drive ...</description><pubDate>Tue, 5 Apr 2011 00:00:00 GMT</pubDate><category>Gearbox Repair for Loading Crane</category></item><item><title>Geared Motor keeps product mixing</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_287.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_287.pdf</guid><description>A large coke company had a conveyor feeding out of a large hopper to mix product on a large delivery belt, however the process had chang...</description><pubDate>Mon, 4 Apr 2011 00:00:00 GMT</pubDate><category>Geared Motor keeps product mixing</category></item><item><title>Steel Dust Ingress Prevented</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_283.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_283.pdf</guid><description>A large steel manufacturer was experiencing problems with a large 575kw crane motor which was failing on a regular basis due to the ingress ...</description><pubDate>Fri, 18 Mar 2011 00:00:00 GMT</pubDate><category>Steel Dust Ingress Prevented</category></item><item><title>Valve, Flange and Hose Replaced to Reduce Failure</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_281.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_281.pdf</guid><description>A large chemical and plastics company was experiencing problems on one of their steam hoses. A 2&amp;quot; diameter x 600mm long flexible hose on...</description><pubDate>Mon, 14 Mar 2011 00:00:00 GMT</pubDate><category>Valve, Flange and Hose Replaced to Reduce Failure</category></item><item><title>Redesigned Couplings Ensure Failures Are Reduced</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_279.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_279.pdf</guid><description>The customer, a large steel producer, had started a new process to clean up the main tube straightening production line - the li...</description><pubDate>Thu, 10 Mar 2011 00:00:00 GMT</pubDate><category>Redesigned Couplings Ensure Failures Are Reduced</category></item><item><title>Drive Unit Repair for Conveyor Line</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_278.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_278.pdf</guid><description>The customer, a large steel producer, experienced an onsite failure to a conveyor drive unit that transported coal from the yard up ...</description><pubDate>Thu, 10 Mar 2011 00:00:00 GMT</pubDate><category>Drive Unit Repair for Conveyor Line</category></item><item><title>Drive Unit Assembly Inspection</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_276.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_276.pdf</guid><description>The Customer, a large steel manufacturer, had an issue with some drive assemblies that they had been having reconditioned with a 3rd...</description><pubDate>Thu, 10 Mar 2011 00:00:00 GMT</pubDate><category>Drive Unit Assembly Inspection</category></item><item><title>Gears Manufactured by ERIKS</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_275.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_275.pdf</guid><description>ERIKS Technology Centre for Drives were called in to assist a steel manufacturing site who, whilst carrying out a maintenance check duri...</description><pubDate>Thu, 10 Mar 2011 00:00:00 GMT</pubDate><category>Gears Manufactured by ERIKS</category></item><item><title>Gearbox for Russia</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_274.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_274.pdf</guid><description>One of ERIKS customers was in Russia servicing an old mixer on site, an old Shaft Mounted Speed Reducer was damaged and needed repl...</description><pubDate>Mon, 7 Mar 2011 00:00:00 GMT</pubDate><category>Gearbox for Russia</category></item><item><title>Fenner Gearbox replaces obsolete unit</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_273.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_273.pdf</guid><description>A distillery in Northern Scotland were having problems with a very old worm gearbox which was close to complete failure, and could stop ...</description><pubDate>Fri, 4 Mar 2011 00:00:00 GMT</pubDate><category>Fenner Gearbox replaces obsolete unit</category></item><item><title>PTFE Spring Energised Lip Seals for Washroom Dispensers</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_269.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_269.pdf</guid><description>The customer, Europes leading innovator, designer and manufacturer of dispensers worldwide, were experiencing problems with...</description><pubDate>Thu, 3 Mar 2011 00:00:00 GMT</pubDate><category>PTFE Spring Energised Lip Seals for Washroom Dispensers</category></item><item><title>Loading Arm Seals for Oil Services Company</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_268.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_268.pdf</guid><description>A leading oil services company, who design, manufacture and supply a full range of ambient and cryogenic marine loading arms to comp...</description><pubDate>Thu, 3 Mar 2011 00:00:00 GMT</pubDate><category>Loading Arm Seals for Oil Services Company</category></item><item><title>Variable Speed Drive reduces energy consumption</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_266.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_266.pdf</guid><description>A leading manufacturer of activated carbon was looking for ways to reduce energy costs within the manufacturing process, so ERIKS were c...</description><pubDate>Tue, 1 Mar 2011 00:00:00 GMT</pubDate><category>Variable Speed Drive reduces energy consumption</category></item><item><title>Fenner Geared Motors increase uptime</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_262.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_262.pdf</guid><description>The customer, a large food and beverage manufacturer was experiencing issues with alot of their conveyor drive units failing and to make...</description><pubDate>Tue, 1 Mar 2011 00:00:00 GMT</pubDate><category>Fenner Geared Motors increase uptime</category></item><item><title>Wedge Belts Solve Issues for Stone Grinder</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_261.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_261.pdf</guid><description>A bakery in Southampton were experiencing problems on their stone grinders, the grinders were driven by multiple wedge belts from groove...</description><pubDate>Tue, 1 Mar 2011 00:00:00 GMT</pubDate><category>Wedge Belts Solve Issues for Stone Grinder</category></item><item><title>Gearbox and Motor Delivered Urgently</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_260.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_260.pdf</guid><description>An un-badged drive unit had failed for a large bakery, potentially causing ship discharging not to take place. Russ Horrigan, ER...</description><pubDate>Mon, 28 Feb 2011 00:00:00 GMT</pubDate><category>Gearbox and Motor Delivered Urgently</category></item><item><title>ATEX Compliant Drives</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_259.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_259.pdf</guid><description>A crop harvesting company were embarking on a new upgrade project to update their meal out-loading process screws, with ATEX certifi...</description><pubDate>Mon, 28 Feb 2011 00:00:00 GMT</pubDate><category>ATEX Compliant Drives</category></item><item><title>Hardness Testing Machine for the North Sea</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_258.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_258.pdf</guid><description>ERIKS UK were approached by a company in County Durham - who heat treat large pipes for the North Sea Offshore Industry - to assist ...</description><pubDate>Mon, 28 Feb 2011 00:00:00 GMT</pubDate><category>Hardness Testing Machine for the North Sea</category></item><item><title>High Temperature Gasket For Cookers</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_255.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_255.pdf</guid><description>A long standing customer of ERIKS Gasket Technology, called on its Engineers to solve a major sealing problem on one of their new cooker...</description><pubDate>Wed, 23 Feb 2011 00:00:00 GMT</pubDate><category>High Temperature Gasket For Cookers</category></item><item><title>Gasket Kits Prevent Water Ingress For Bollards</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_254.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_254.pdf</guid><description>A major road bollard manufacturer contacted ERIKS Gasket Technology to advise on a new innovative road safety product. The rebound bollard&amp;#...</description><pubDate>Wed, 23 Feb 2011 00:00:00 GMT</pubDate><category>Gasket Kits Prevent Water Ingress For Bollards</category></item><item><title>Gasket Solution for Water Ingress</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_253.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_253.pdf</guid><description>When a major telecommunications company insisted that their fleet of vans accommodated roof racks, they forget to take into consideratio...</description><pubDate>Wed, 23 Feb 2011 00:00:00 GMT</pubDate><category>Gasket Solution for Water Ingress</category></item><item><title>Graphite Gasket Solve Pressure Steam Leakage</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_252.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_252.pdf</guid><description>One of ERIKS Waste and Recycling customers was experiencing problems on a modern waste incinerator unit with a leaking cooling condensing pl...</description><pubDate>Wed, 23 Feb 2011 00:00:00 GMT</pubDate><category>Graphite Gasket Solve Pressure Steam Leakage</category></item><item><title>Spiral Wound Gasket Will Prevent Blow Out</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_251.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_251.pdf</guid><description>One of ERIKS customers, a coal fired power station, was using general duty non asbestos fibre gaskets on a fuel oil system. Although...</description><pubDate>Wed, 23 Feb 2011 00:00:00 GMT</pubDate><category>Spiral Wound Gasket Will Prevent Blow Out</category></item><item><title>Non-Stick Gasket Allows For Easy Flange Cleaning</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_250.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_250.pdf</guid><description>One of ERIKS customers was experiencing problems on a heat exchanger application on an electrical grid. The customer was using a general dut...</description><pubDate>Wed, 23 Feb 2011 00:00:00 GMT</pubDate><category>Non-Stick Gasket Allows For Easy Flange Cleaning</category></item><item><title>PTFE Gasket Solution Solves Acid Leakage</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_249.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_249.pdf</guid><description>One of ERIKS Chemical Industry customers was experiencing leakage problems on a few of their high pressure pumps. The gasket specification s...</description><pubDate>Wed, 23 Feb 2011 00:00:00 GMT</pubDate><category>PTFE Gasket Solution Solves Acid Leakage</category></item><item><title>Fire Safe Graphite Gasket</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_248.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_248.pdf</guid><description>A large aerospace OEM customer, as part of their production process, had a furnace operating at over 450 Deg C. To meet with newly i...</description><pubDate>Wed, 23 Feb 2011 00:00:00 GMT</pubDate><category>Fire Safe Graphite Gasket</category></item><item><title>Graphite Gasket Prevents Steam Leaks</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_247.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_247.pdf</guid><description>The customer, a household waste disposal company, was using  a competitors oval door joints on steam drum access doors at 280 d...</description><pubDate>Tue, 22 Feb 2011 00:00:00 GMT</pubDate><category>Graphite Gasket Prevents Steam Leaks</category></item><item><title>Special PTFE Gasket  Seals Damaged Flange Faces</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_246.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_246.pdf</guid><description>On a critical part of the process plant, the client was experiencing problems on an acid application. Long term degradation of the flang...</description><pubDate>Tue, 22 Feb 2011 00:00:00 GMT</pubDate><category>Special PTFE Gasket  Seals Damaged Flange Faces</category></item><item><title>Gear Pumps Replaced </title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_245.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_245.pdf</guid><description>A leading potato and chip processor operated two old gear pumps on their fats recovery system. These pumps had proved troublesome over the y...</description><pubDate>Mon, 21 Feb 2011 00:00:00 GMT</pubDate><category>Gear Pumps Replaced </category></item><item><title>Frequent pump failures solved</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_241.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_241.pdf</guid><description>A confectionary manufacturer currently use 6no. BVC vacuum pumps to hold the biscuit in place on a conveyor, prior to going through a pa...</description><pubDate>Sun, 20 Feb 2011 00:00:00 GMT</pubDate><category>Frequent pump failures solved</category></item><item><title>Custom Fenner Coupling</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_221.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_221.pdf</guid><description>When a customer needed a Fenaflex coupling to work with engine/pump sets that used 3-cylinder engines with an SAE 6.1/2 flywheel, th...</description><pubDate>Thu, 17 Feb 2011 00:00:00 GMT</pubDate><category>Custom Fenner Coupling</category></item><item><title>Fenner PowerTwist Keeps Food Frozen</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_220.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_220.pdf</guid><description>A frozen food distribution centre were experiencing a breakdown on the belt drive in their chiller unit, and contacted their local ERIKS...</description><pubDate>Thu, 17 Feb 2011 00:00:00 GMT</pubDate><category>Fenner PowerTwist Keeps Food Frozen</category></item><item><title>Fenner Series F Moves Welded Rail</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_219.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_219.pdf</guid><description>A large steel company based in Scunthorpe had a new project to manufacture a conveyor line to move long welded rail. &amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;
ERIKS...</description><pubDate>Wed, 16 Feb 2011 00:00:00 GMT</pubDate><category>Fenner Series F Moves Welded Rail</category></item><item><title>Fenner Powertwist Reduces Downtime</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_218.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_218.pdf</guid><description>An ERIKS customer, a large producer of seeds and crop protection, had been experiencing problems over a 12 month period with an incr...</description><pubDate>Mon, 14 Feb 2011 00:00:00 GMT</pubDate><category>Fenner Powertwist Reduces Downtime</category></item><item><title>Fenner Quattro Belts Keep Fan Running</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_217.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_217.pdf</guid><description>A large steel manufacturer based in Sheffield were experiencing problems with a fan system that supplied cooling air to the main motor contr...</description><pubDate>Fri, 11 Feb 2011 00:00:00 GMT</pubDate><category>Fenner Quattro Belts Keep Fan Running</category></item><item><title>Couplings Delivered In Time For Shut-Down</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_216.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_216.pdf</guid><description>A large steel manufacturer in Corby were preparing for their routine maintenance schedule during their annual shut-down period, when...</description><pubDate>Fri, 11 Feb 2011 00:00:00 GMT</pubDate><category>Couplings Delivered In Time For Shut-Down</category></item><item><title>Installation Training Leads to Savings</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_215.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_215.pdf</guid><description>A large OEM, who manufactures ventilation products, were experiencing quality issues with their previous supplier and installation i...</description><pubDate>Tue, 8 Feb 2011 00:00:00 GMT</pubDate><category>Installation Training Leads to Savings</category></item><item><title>Rod Seal Delivered to Meet Customer Needs</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_212.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_212.pdf</guid><description>The customer asked ERIKS to replicate a rod seal supplied by another Seal supplier. This seal was constructed from Hydrogenated NBR with a r...</description><pubDate>Mon, 31 Jan 2011 00:00:00 GMT</pubDate><category>Rod Seal Delivered to Meet Customer Needs</category></item><item><title>Enhanced Pipeline Solution</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_211.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_211.pdf</guid><description>One of ERIKS customers requested an alternative arrangement for their large aperture, low pressure (ANSI 150) door seal. Their e...</description><pubDate>Mon, 31 Jan 2011 00:00:00 GMT</pubDate><category>Enhanced Pipeline Solution</category></item><item><title>Labyrinth Seal Protects Bearing</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_210.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_210.pdf</guid><description>The customer, a leading supplier in plant for food processing had been experiencing problems on their production rollers. They were usin...</description><pubDate>Mon, 31 Jan 2011 00:00:00 GMT</pubDate><category>Labyrinth Seal Protects Bearing</category></item><item><title>Seals Inventory Improvements</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_209.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_209.pdf</guid><description>One of the worlds leading manufacturers of compressed air and gas systems product range includes rotary screw, oil-free, va...</description><pubDate>Mon, 31 Jan 2011 00:00:00 GMT</pubDate><category>Seals Inventory Improvements</category></item><item><title>Fenner Geared Motor for Bakery</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_208.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_208.pdf</guid><description>One of ERIKS customers, a bakery, were experiencing problems on two of their applications. They contacted their local Service Centre...</description><pubDate>Mon, 31 Jan 2011 00:00:00 GMT</pubDate><category>Fenner Geared Motor for Bakery</category></item><item><title>Laser Aids Belt Drive Alignment</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_190.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_190.pdf</guid><description>One of ERIKS largest OEM customers, manufactures blower units, which are used all over the world providing vacuum and pressure solut...</description><pubDate>Fri, 28 Jan 2011 00:00:00 GMT</pubDate><category>Laser Aids Belt Drive Alignment</category></item><item><title>Fenner Inverter Decreases Costs</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_189.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_189.pdf</guid><description>The production of one of the countries most popular snack foods used 18 individual 4kW air handling units in the cooling process. The system...</description><pubDate>Fri, 28 Jan 2011 00:00:00 GMT</pubDate><category>Fenner Inverter Decreases Costs</category></item><item><title>Added Value for OEM</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_185.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_185.pdf</guid><description>An ERIKS OEM customer needed to design a solution which would allow users to access services underground, neatly, quickly and with m...</description><pubDate>Thu, 16 Dec 2010 00:00:00 GMT</pubDate><category>Added Value for OEM</category></item><item><title>Pump Hose Failure Solved</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_168.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_168.pdf</guid><description>The customer, a large steel producer was using a 4&amp;quot; peristaltic pump to move water and particles of grit. When larger particles got ...</description><pubDate>Thu, 2 Dec 2010 00:00:00 GMT</pubDate><category>Pump Hose Failure Solved</category></item><item><title>Energy reduction for Textiles Manufacturer</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_167.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_167.pdf</guid><description>The customer, a large manufacturer of furnishing fabrics was using a generally inefficient pump with capabilities that far exceeded its ...</description><pubDate>Thu, 2 Dec 2010 00:00:00 GMT</pubDate><category>Energy reduction for Textiles Manufacturer</category></item><item><title>Energy Savings for Packaging Producer</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_166.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_166.pdf</guid><description>The customer, a large packaging producer, had 9 pumps installed with 150kW motors. All the pumps were not running on curve or to the...</description><pubDate>Thu, 2 Dec 2010 00:00:00 GMT</pubDate><category>Energy Savings for Packaging Producer</category></item><item><title>Energy Saving for Food Manufacturer</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_165.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_165.pdf</guid><description>The customer, a large food manufacturer had 2 Grundfos CR boiler feed pumps installed, running on a fixed duty. Both 22kW pumps were...</description><pubDate>Thu, 2 Dec 2010 00:00:00 GMT</pubDate><category>Energy Saving for Food Manufacturer</category></item><item><title>Air Leak Survey Identifies Savings </title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_163.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_163.pdf</guid><description>ERIKS UK were asked by one of their customers, a leading confectionary manufacturer in the UK to carry out an air leak survey on one of ...</description><pubDate>Fri, 26 Nov 2010 00:00:00 GMT</pubDate><category>Air Leak Survey Identifies Savings </category></item><item><title>Pump And Filter For Ash And Water</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_161.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_161.pdf</guid><description>A UK power station approached ERIKS Pump Technology with an interesting application. The basement of the boiler house was prone to flooding&amp;...</description><pubDate>Thu, 25 Nov 2010 00:00:00 GMT</pubDate><category>Pump And Filter For Ash And Water</category></item><item><title>Seals Produce 10 Million Extra Biscuits a Week</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_160.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_160.pdf</guid><description>A well known biscuit manufacturer was experiencing problems with their biscuit filling machine. The original seals, comprising of an O&amp;#...</description><pubDate>Thu, 25 Nov 2010 00:00:00 GMT</pubDate><category>Seals Produce 10 Million Extra Biscuits a Week</category></item><item><title>Cooled Top Seal Arrangement Allows For Elevated Temperatures</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_159.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_159.pdf</guid><description>A food manufacturing company were looking to upgrade two old obsolete hot water supply pumps within their boiler house. ERIKS Pump Technolog...</description><pubDate>Thu, 25 Nov 2010 00:00:00 GMT</pubDate><category>Cooled Top Seal Arrangement Allows For Elevated Temperatures</category></item><item><title>High Pressure Coolant Pumps</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_158.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_158.pdf</guid><description>A major aerospace component manufacturer, were looking to upgrade their existing coolant supply pumps to a high pressure coolant pump fo...</description><pubDate>Thu, 25 Nov 2010 00:00:00 GMT</pubDate><category>High Pressure Coolant Pumps</category></item><item><title>Booster Set For Cooling Water Circuit</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_157.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_157.pdf</guid><description>A major aerospace component manufacturer operated 6 fixed speed end suction pumps on the sites cooling water circuit. These 6 pumps were eac...</description><pubDate>Thu, 25 Nov 2010 00:00:00 GMT</pubDate><category>Booster Set For Cooling Water Circuit</category></item><item><title>Self-Priming Pump Replaces Failing Submersible Pumps</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_156.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_156.pdf</guid><description>This client, a vegetable food processing factory operate their own effluent treatment plant dealing with all the wash down waste coming ...</description><pubDate>Thu, 25 Nov 2010 00:00:00 GMT</pubDate><category>Self-Priming Pump Replaces Failing Submersible Pumps</category></item><item><title>Flow Monitor to MCERTS Confirmity</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_155.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_155.pdf</guid><description>A beverage factory within the UK needed its effluent treatment plants outfall to conform to MCERTS by installing a continuous water monitori...</description><pubDate>Thu, 25 Nov 2010 00:00:00 GMT</pubDate><category>Flow Monitor to MCERTS Confirmity</category></item><item><title>Portable Filtration Package For Power Station</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_153.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_153.pdf</guid><description>A UK Gas fired power station, had been receiving unsatisfactory laboratory results from oil samples taken from the power stations gas an...</description><pubDate>Thu, 25 Nov 2010 00:00:00 GMT</pubDate><category>Portable Filtration Package For Power Station</category></item><item><title>Fan Assembly Replacement</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_152.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_152.pdf</guid><description>A large rubber manufacturer for the tyre industry was experiencing problems on one of their fan units. Following repeated visits to the cust...</description><pubDate>Wed, 24 Nov 2010 00:00:00 GMT</pubDate><category>Fan Assembly Replacement</category></item><item><title>Bearing Manufacture Saves the Day</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_150.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_150.pdf</guid><description>The customer, a large pharmaceutical ingredients manufacturer contacted ERIKS Technology Centre for Gearbox Repairs to dismantle and rep...</description><pubDate>Mon, 22 Nov 2010 00:00:00 GMT</pubDate><category>Bearing Manufacture Saves the Day</category></item><item><title>Submersible Pumps for Sleepers</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_149.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_149.pdf</guid><description>ERIKS client, a manufacturer of railway line sleepers, had received a quote for a submersible pump to remove wash down / rain water ...</description><pubDate>Fri, 19 Nov 2010 00:00:00 GMT</pubDate><category>Submersible Pumps for Sleepers</category></item><item><title>Obsolete Pump Replaced And Saves Money</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_148.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_148.pdf</guid><description>A client in the Mining and Quarrying Industry approached ERIKS Pump Technology to replace an old, now obsolete Grundfos vertical multist...</description><pubDate>Thu, 18 Nov 2010 00:00:00 GMT</pubDate><category>Obsolete Pump Replaced And Saves Money</category></item><item><title>Diaphragm Pump Failures Solved</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_147.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_147.pdf</guid><description>A client was experiencing repeated failures on an air operated double diaphragm pump. ERIKS Pump Technology investigated and found the pump ...</description><pubDate>Thu, 18 Nov 2010 00:00:00 GMT</pubDate><category>Diaphragm Pump Failures Solved</category></item><item><title>Inverter Pump Saves Energy For Swimmers</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_146.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_146.pdf</guid><description>Eriks Pump Technology were approached to assess an interesting application with a clients outdoor swimming pool at a college in South W...</description><pubDate>Thu, 18 Nov 2010 00:00:00 GMT</pubDate><category>Inverter Pump Saves Energy For Swimmers</category></item><item><title>Pump Parts Delivered In Fraction Of Time</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_145.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_145.pdf</guid><description>A Food Manufacturing plant operates a number of flume transfer pumps on a critical 24hr a day application transferring dirty water from the ...</description><pubDate>Thu, 18 Nov 2010 00:00:00 GMT</pubDate><category>Pump Parts Delivered In Fraction Of Time</category></item><item><title>Pump Spares for Food Manufacturer</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_144.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_144.pdf</guid><description>A Food manufacturing plant operates a critical progressive cavity pump on their production process. After receiving a poor response to spare...</description><pubDate>Thu, 18 Nov 2010 00:00:00 GMT</pubDate><category>Pump Spares for Food Manufacturer</category></item><item><title>Pump Spares Manufactured For Cider Factory</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_142.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_142.pdf</guid><description>A Cider factory operates 4 critical progressive cavity pumps in their mill process. After a number of years service the site decided to...</description><pubDate>Thu, 18 Nov 2010 00:00:00 GMT</pubDate><category>Pump Spares Manufactured For Cider Factory</category></item><item><title>Obsolete Pump Replaced For Potato Washing</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_140.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_140.pdf</guid><description>A leading potato and chip processor operates an obsolete Robot fitted to his potato washing line. In line with company guidelines the site l...</description><pubDate>Tue, 16 Nov 2010 00:00:00 GMT</pubDate><category>Obsolete Pump Replaced For Potato Washing</category></item><item><title>Efficient Chilled Water Pumps For Mushroom Grower</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_137.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_137.pdf</guid><description>A leading mushroom grower currently operates five fixed speed centrifugal pumps within their growing sheds, to pump chilled water around...</description><pubDate>Tue, 16 Nov 2010 00:00:00 GMT</pubDate><category>Efficient Chilled Water Pumps For Mushroom Grower</category></item><item><title>Modern Liquid Ring Vacuum Pumps Save Energy</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_136.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_136.pdf</guid><description>A leading double glazing profile manufacturer currently operate 4  liquid ring vacuum pumps on extruder and calibration table duties. These ...</description><pubDate>Tue, 16 Nov 2010 00:00:00 GMT</pubDate><category>Modern Liquid Ring Vacuum Pumps Save Energy</category></item><item><title>Energy Saving Pump Solution</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_135.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_135.pdf</guid><description>A leading plastics company currently operate two fixed speed cooling water pumps, on their factory cooling water circuit. This water is ...</description><pubDate>Tue, 16 Nov 2010 00:00:00 GMT</pubDate><category>Energy Saving Pump Solution</category></item><item><title>Pump Redesign Allows for Bearing Lubrication</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_133.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_133.pdf</guid><description>A UK Gas fired power station operates a set of 8 long coupled centrifugal condensate return pumps on their plant. These 8 pumps had been mis...</description><pubDate>Tue, 16 Nov 2010 00:00:00 GMT</pubDate><category>Pump Redesign Allows for Bearing Lubrication</category></item><item><title>Superior Hose for Sausage and Bean Line</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_132.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_132.pdf</guid><description>A large ERIKS Integrated Solutions customer expressed an interest in upgrading several of the hoses on their sausage and bean line. They wan...</description><pubDate>Tue, 16 Nov 2010 00:00:00 GMT</pubDate><category>Superior Hose for Sausage and Bean Line</category></item><item><title>Insulated Hose Cuts Energy Costs</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_130.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_130.pdf</guid><description>A leading chilled and frozen meal solution manufacturer were using a stainless steel hose to convey steam from the nearby central steam line...</description><pubDate>Mon, 15 Nov 2010 00:00:00 GMT</pubDate><category>Insulated Hose Cuts Energy Costs</category></item><item><title>Food Grade Hose for Meat Free Food</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_129.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_129.pdf</guid><description>A large producer of healthy meat alternative foods were having an issue with a flexible steel braided hose. In order to offset the pipe conn...</description><pubDate>Mon, 15 Nov 2010 00:00:00 GMT</pubDate><category>Food Grade Hose for Meat Free Food</category></item><item><title>X Ring Reduces Seal Extrusion</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_128.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_128.pdf</guid><description>An ERIKS OEM customer, a world leading motion and control systems manufacturer was experiencing problems with a compressed air preparati...</description><pubDate>Thu, 4 Nov 2010 00:00:00 GMT</pubDate><category>X Ring Reduces Seal Extrusion</category></item><item><title>PTFE Seal Protects Roller Bearing</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_127.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_127.pdf</guid><description>Recycling has become commonplace in society, from clothes to household plastic and paper rubbish. Recently, due to the replacement o...</description><pubDate>Thu, 4 Nov 2010 00:00:00 GMT</pubDate><category>PTFE Seal Protects Roller Bearing</category></item><item><title>Swaged Hygienic Hose Reduces Injury Risk </title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_121.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_121.pdf</guid><description>During a visit from James MacDougall, an ERIKS Hose Technology Engineer, to a large Bakery ingredients manufacturer, he noticed ...</description><pubDate>Wed, 20 Oct 2010 00:00:00 GMT</pubDate><category>Swaged Hygienic Hose Reduces Injury Risk </category></item><item><title>Obsolete Brake Plate Replaced Same Day</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_120.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_120.pdf</guid><description>A large defence and aerospace customer contacted their on site ERIKS service centre, to purchase 2 Brake Plates for their HTR Machine wh...</description><pubDate>Wed, 20 Oct 2010 00:00:00 GMT</pubDate><category>Obsolete Brake Plate Replaced Same Day</category></item><item><title>Torque Clutch Coupling Safeguards Packaging Machine</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_119.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_119.pdf</guid><description>A global food manufacturer of coffee, confectionary and cereal was experiencing problems with a packaging machine that forms cardboard r...</description><pubDate>Mon, 18 Oct 2010 00:00:00 GMT</pubDate><category>Torque Clutch Coupling Safeguards Packaging Machine</category></item><item><title>Metallic Hose Aids Health and Safety for Gas Delivery Tankers</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_118.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_118.pdf</guid><description>A world leader in gases for industry, health and the environment were unhappy with the delivery hoses they were using on their CO2 and N...</description><pubDate>Thu, 14 Oct 2010 00:00:00 GMT</pubDate><category>Metallic Hose Aids Health and Safety for Gas Delivery Tankers</category></item><item><title>Spherical Bearing Recommendation</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_117.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_117.pdf</guid><description>A Global Steel manufacturing and service company were looking for a recommendation for future bearing failures on their hot air extraction f...</description><pubDate>Wed, 13 Oct 2010 00:00:00 GMT</pubDate><category>Spherical Bearing Recommendation</category></item><item><title>Inverter Increases Reliability and Reduces Costs</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_116.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_116.pdf</guid><description>A large Utility customer was experiencing frequent reliability issues with belt driven drives on positive displacement equipment used for tr...</description><pubDate>Wed, 29 Sep 2010 00:00:00 GMT</pubDate><category>Inverter Increases Reliability and Reduces Costs</category></item><item><title>Archimedes Screw Repaired In Situ</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_114.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_114.pdf</guid><description>A large Utility company were faced with damaged flighting on their Archimedes Screw, due to a failed bearing causing the main screw to d...</description><pubDate>Tue, 28 Sep 2010 00:00:00 GMT</pubDate><category>Archimedes Screw Repaired In Situ</category></item><item><title>Fenner Gearbox and Motor for Aeration</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_112.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_112.pdf</guid><description>A large Utility company were faced with a motor and gearbox failure on an aerator on their sewage treatment plant. Either spares or a replac...</description><pubDate>Tue, 28 Sep 2010 00:00:00 GMT</pubDate><category>Fenner Gearbox and Motor for Aeration</category></item><item><title>Stub Shafts Reclaim Belt Press Rollers</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_111.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_111.pdf</guid><description>A large Utility company were experiencing bearing failure resulting in roller damage on their belt press rollers. The equipment, on a se...</description><pubDate>Tue, 28 Sep 2010 00:00:00 GMT</pubDate><category>Stub Shafts Reclaim Belt Press Rollers</category></item><item><title>Fenner Gearbox and Motor Repairs Aerator</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_110.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_110.pdf</guid><description>A large Utility company were faced with a motor and gearbox failure on an aerator on their sewage treatment plant. Either spares or a replac...</description><pubDate>Tue, 28 Sep 2010 00:00:00 GMT</pubDate><category>Fenner Gearbox and Motor Repairs Aerator</category></item><item><title>Fenner Gearbox and Motor Facilitates Aeration</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_109.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_109.pdf</guid><description>A large Utility company were faced with a motor and gearbox failure on an aerator on their sewage treatment plant. Either spares or a replac...</description><pubDate>Tue, 28 Sep 2010 00:00:00 GMT</pubDate><category>Fenner Gearbox and Motor Facilitates Aeration</category></item><item><title>Rotary Bio Centrifuge Failure on Sewage Treatment Plant</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_107.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_107.pdf</guid><description>A large Utility company were faced with a corroded main frame which had caused the RBC (Rotary Bio Centrifuge) to fail on their pack...</description><pubDate>Tue, 28 Sep 2010 00:00:00 GMT</pubDate><category>Rotary Bio Centrifuge Failure on Sewage Treatment Plant</category></item><item><title>Temporary Access Platform Aids Health and Safety</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_104.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_104.pdf</guid><description>A large Utility company were experiencing Health and Safety issues when trying to gain access to their Primary Settlement Tanks (PST&amp;#41...</description><pubDate>Fri, 17 Sep 2010 00:00:00 GMT</pubDate><category>Temporary Access Platform Aids Health and Safety</category></item><item><title>Crumbling Primary Settlement Tank Walls Strengthened</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_103.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_103.pdf</guid><description>A large Utility company were experiencing issues with crumbling walls on one of their Primary Settlement tanks. The walls support the rotati...</description><pubDate>Fri, 17 Sep 2010 00:00:00 GMT</pubDate><category>Crumbling Primary Settlement Tank Walls Strengthened</category></item><item><title>Primary Settlement Tank Centre Column Replacement</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_102.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_102.pdf</guid><description>A large Utility company were experiencing failure issues surrounding one of their Primary Settlement Tanks which had a corroded centre struc...</description><pubDate>Fri, 17 Sep 2010 00:00:00 GMT</pubDate><category>Primary Settlement Tank Centre Column Replacement</category></item><item><title>ERIKS Saves Cream Production</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_100.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_100.pdf</guid><description>One of ERIKS large Dairy customers, responsible for 30% of the fresh milk consumed in Britain each day, suffered a crucial Pump...</description><pubDate>Fri, 3 Sep 2010 00:00:00 GMT</pubDate><category>ERIKS Saves Cream Production</category></item><item><title>Geared Motor Available Off The Shelf Dramatically Cuts Leadtime</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_99.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_99.pdf</guid><description>A large breakfast cereal producers cookers are currently driven by a very complicated and bespoke double reduction gearbox incorporatin...</description><pubDate>Thu, 2 Sep 2010 00:00:00 GMT</pubDate><category>Geared Motor Available Off The Shelf Dramatically Cuts Leadtime</category></item><item><title>ERIKS Saves 200 Man Hours</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_96.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_96.pdf</guid><description>Edgmond Foods are based in Newport Shropshire and produce a range of quiche and frittatas. They recently suffered a breakdown on one of thei...</description><pubDate>Mon, 16 Aug 2010 00:00:00 GMT</pubDate><category>ERIKS Saves 200 Man Hours</category></item><item><title>Rolling Bearings Save Costs</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_95.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_95.pdf</guid><description>A well known confectionary producer was experiencing downtime on their chocolate crumb vacuum oven, due to unreliable operation of the b...</description><pubDate>Tue, 10 Aug 2010 00:00:00 GMT</pubDate><category>Rolling Bearings Save Costs</category></item><item><title>Softstart Replacements for Sewage Plant</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_94.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_94.pdf</guid><description>A large Utility company who operate and maintain water and  wastewater assets were suffering with maintainablity and reliability problems on...</description><pubDate>Tue, 10 Aug 2010 00:00:00 GMT</pubDate><category>Softstart Replacements for Sewage Plant</category></item><item><title>Gearbox Unit Repairs and Enhances Conveyor Unit</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_93.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_93.pdf</guid><description>The customer, Lafarge Aggregates Ltd, Whisby Quarry, Lincoln had a problem, an ELRAM unit on site on a load out chute convey...</description><pubDate>Mon, 9 Aug 2010 00:00:00 GMT</pubDate><category>Gearbox Unit Repairs and Enhances Conveyor Unit</category></item><item><title>Crows Reveal a 30% Saving</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_92.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_92.pdf</guid><description>A large manufacturer of air conditioning units was experiencing problems with several lengths of flexible steam hose that led out of their f...</description><pubDate>Wed, 28 Jul 2010 00:00:00 GMT</pubDate><category>Crows Reveal a 30% Saving</category></item><item><title>Unique Hose Solution</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_88.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_88.pdf</guid><description>A large pipework design, fabrication and installation company were involved with the construction of the largest household waste disposa...</description><pubDate>Fri, 23 Jul 2010 00:00:00 GMT</pubDate><category>Unique Hose Solution</category></item><item><title>Industrial Hose Keeps Toothpaste Filling</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_87.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_87.pdf</guid><description>A large Health and Beauty products manufacturer was experiencing problems with their toothpaste filling lines. A lack of back pressure was c...</description><pubDate>Fri, 23 Jul 2010 00:00:00 GMT</pubDate><category>Industrial Hose Keeps Toothpaste Filling</category></item><item><title>ERIKS Keeps Onion Ring Production Going</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_86.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_86.pdf</guid><description>The UKs largest onion ring manufacturer called ERIKS to solve an issue they had on their spiral freezer. The main drive on the spiral f...</description><pubDate>Thu, 22 Jul 2010 00:00:00 GMT</pubDate><category>ERIKS Keeps Onion Ring Production Going</category></item><item><title>Helical Gearbox and Inverter Replace Innefficient Drive</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_85.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_85.pdf</guid><description>A large Utility company called on ERIKS to investigate the main drives on a final settlement tank. The main drives were causing damage to th...</description><pubDate>Tue, 20 Jul 2010 00:00:00 GMT</pubDate><category>Helical Gearbox and Inverter Replace Innefficient Drive</category></item><item><title>Spiral Wrapped Hoses Reduce Safety Concerns</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_84.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_84.pdf</guid><description>A leading energy and petrochemical company were experiencing a safety critical issue. One of their sites has many different chemicals and wa...</description><pubDate>Tue, 20 Jul 2010 00:00:00 GMT</pubDate><category>Spiral Wrapped Hoses Reduce Safety Concerns</category></item><item><title>Coupling Failure Solved</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_83.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_83.pdf</guid><description>Robert Wiseman Dairies, who produce 30% of the fresh milk consumed in Britain everyday, were experiencing coupling failures which we...</description><pubDate>Fri, 16 Jul 2010 00:00:00 GMT</pubDate><category>Coupling Failure Solved</category></item><item><title>Replacement Gearbox, Motor and Inverter Increase Efficiency</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_81.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_81.pdf</guid><description>A large Utility company called on ERIKS expertise to investigate the scraper drives on their primary settlement tanks. ERIKS identified that...</description><pubDate>Mon, 12 Jul 2010 00:00:00 GMT</pubDate><category>Replacement Gearbox, Motor and Inverter Increase Efficiency</category></item><item><title>Durable Hose for Beverage Manufacturer</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_78.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_78.pdf</guid><description>The worlds largest provider of retailer brand soft drinks, were experiencing premature failure of their food grade hoses. They contacted...</description><pubDate>Mon, 12 Jul 2010 00:00:00 GMT</pubDate><category>Durable Hose for Beverage Manufacturer</category></item><item><title>Coke Supply Hose Meets Tough Requirements</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_76.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_76.pdf</guid><description>A large pneumatic conveyor, injection and filtration supplier to the iron, steel, gypsum and cement producing industries were de...</description><pubDate>Fri, 9 Jul 2010 00:00:00 GMT</pubDate><category>Coke Supply Hose Meets Tough Requirements</category></item><item><title>Collapsed Hose Problem Solved by ERIKS</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_75.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_75.pdf</guid><description>The customer; producers of soft cheese and cheese spread, had an issue with the intake hoses on their soft cheese pumps. The hoses were ...</description><pubDate>Fri, 9 Jul 2010 00:00:00 GMT</pubDate><category>Collapsed Hose Problem Solved by ERIKS</category></item><item><title>ERIKS Hose Solution Solves FDA Non-Compliance Issues</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_74.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_74.pdf</guid><description>A leading global Pharmaceutical organisation, had recently been audited by the FDA.  The FDA issued them with several non-compliance...</description><pubDate>Fri, 9 Jul 2010 00:00:00 GMT</pubDate><category>ERIKS Hose Solution Solves FDA Non-Compliance Issues</category></item><item><title>Superior Ducting Reduces Downtime</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_73.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_73.pdf</guid><description>A major producer of lottery scratch cards for the European market, were faced with issues on their large printing press which produced t...</description><pubDate>Fri, 9 Jul 2010 00:00:00 GMT</pubDate><category>Superior Ducting Reduces Downtime</category></item><item><title>Drive Redesign Cuts Costs for BAE Systems</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_71.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_71.pdf</guid><description>BAE Systems at Samlesbury were experiencing problems with five of their air handling units, even with inverters fitted, the units we...</description><pubDate>Wed, 7 Jul 2010 00:00:00 GMT</pubDate><category>Drive Redesign Cuts Costs for BAE Systems</category></item><item><title>ERIKS Design Modular Hose System</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_68.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_68.pdf</guid><description>One of the largest suppliers of industrial gases had installed a new reverse osmosis line which has filters which need to be Clean-In&amp;#4...</description><pubDate>Tue, 6 Jul 2010 00:00:00 GMT</pubDate><category>ERIKS Design Modular Hose System</category></item><item><title>ERIKS Hose Expertise Reduces Costs and Downtime</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_60.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_60.pdf</guid><description>ERIKS Hose Technology Centre were contacted by a large paper converting machinery customer when one of their water hoses failed. An ERI...</description><pubDate>Tue, 29 Jun 2010 00:00:00 GMT</pubDate><category>ERIKS Hose Expertise Reduces Costs and Downtime</category></item><item><title>ERIKS Minimise Vibration for Dairy Crest Hanworth</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_58.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_58.pdf</guid><description>ERIKS Integrated Solutions, who operate the Engineering Stores on site at Dairy Crest Hanworth, were asked to investigate vibration ...</description><pubDate>Tue, 29 Jun 2010 00:00:00 GMT</pubDate><category>ERIKS Minimise Vibration for Dairy Crest Hanworth</category></item><item><title>ERIKS Cut Hose Spend by Half</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_57.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_57.pdf</guid><description>ERIKS Integrated Supply at Dairy Crest Chadwell Heath contacted ERIKS Hose Technology to visit site and analyse their hose usage. Dairy Cres...</description><pubDate>Tue, 29 Jun 2010 00:00:00 GMT</pubDate><category>ERIKS Cut Hose Spend by Half</category></item><item><title>ERIKS Breathe New Life into Still Animatronic</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_52.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_52.pdf</guid><description>A faulty animatronic feature situated in the main reception of Alton Towers Resort Hotel was brought to the attention of Martin Airey (A...</description><pubDate>Fri, 25 Jun 2010 00:00:00 GMT</pubDate><category>ERIKS Breathe New Life into Still Animatronic</category></item><item><title>Premier Foods</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_51.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_51.pdf</guid><description>An opportunity for a cost saving was indentified by Wil Woodrow - ERIKS Contract Manager. A food processing plant was using some older s...</description><pubDate>Mon, 21 Jun 2010 00:00:00 GMT</pubDate><category>Premier Foods</category></item><item><title>Emergency Breakdown Resolved by New Inverters</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_50.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_50.pdf</guid><description>A food manufacturing site in Lincoln were experiencing a breakdown situation when an inverter failed on their trifle line during their busie...</description><pubDate>Mon, 21 Jun 2010 00:00:00 GMT</pubDate><category>Emergency Breakdown Resolved by New Inverters</category></item><item><title>Premium CRE Belts for Energy Efficient Solutions</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_49.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_49.pdf</guid><description>ERIKS Birmingham service centre was contacted by a local airport who were interested in improving efficiency throughout the airport&amp;#44...</description><pubDate>Mon, 21 Jun 2010 00:00:00 GMT</pubDate><category>Premium CRE Belts for Energy Efficient Solutions</category></item><item><title>Air Survey Leads to Energy Savings</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_48.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_48.pdf</guid><description>In order to monitor efficiency and evaluate any changes made, the company publishes a weekly energy usage figure. Compressed air leakage...</description><pubDate>Mon, 21 Jun 2010 00:00:00 GMT</pubDate><category>Air Survey Leads to Energy Savings</category></item><item><title>Energy and Heat Loss Survey</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_47.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_47.pdf</guid><description>Pirelli commissioned the survey after evaluating in detail the methods that would be used by ERIKS to identify areas of heat loss. Many of t...</description><pubDate>Mon, 21 Jun 2010 00:00:00 GMT</pubDate><category>Energy and Heat Loss Survey</category></item><item><title>ERIKS Upgrade for Luxury Car Manufacturer </title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_46.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_46.pdf</guid><description>During a recent period of plant downtime at a luxury car manufacturer, the Aintree branch of ERIKS Electronics was called in to upgrade ...</description><pubDate>Mon, 21 Jun 2010 00:00:00 GMT</pubDate><category>ERIKS Upgrade for Luxury Car Manufacturer </category></item><item><title>ERIKS Provide Energy Savings </title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_45.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_45.pdf</guid><description>In conjunction with H.J Heinz - Kitt Green utilities, ERIKS were tasked with identifying and resolving compressed air leaks within t...</description><pubDate>Mon, 21 Jun 2010 00:00:00 GMT</pubDate><category>ERIKS Provide Energy Savings </category></item><item><title>Train Reliability Back on the Rails</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_44.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_44.pdf</guid><description>Reliability problems with the channel tunnel freight train traction motors risked affecting service levels so ERIKS engineers were asked to ...</description><pubDate>Mon, 21 Jun 2010 00:00:00 GMT</pubDate><category>Train Reliability Back on the Rails</category></item><item><title>Turnkey Energy Saving Systems</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_40.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_40.pdf</guid><description>Central to the production processes at the Dairy Crest Maelor site near Wrexham are three cooling towers with fans driven by 18.5 kW motors&amp;...</description><pubDate>Fri, 18 Jun 2010 00:00:00 GMT</pubDate><category>Turnkey Energy Saving Systems</category></item><item><title>Air Leak Survey Identifies Financial Savings</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_39.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_39.pdf</guid><description>Cavaghan &amp; Gray were experiencing air leaks with varying financial impacts to the factorys output. Many air leaks were undetected witho...</description><pubDate>Fri, 18 Jun 2010 00:00:00 GMT</pubDate><category>Air Leak Survey Identifies Financial Savings</category></item><item><title>ERIKS Geared up to Prevent Breakdown</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_37.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_37.pdf</guid><description>ERIKS engineers were called out to Walkers Snack Foods where an existing offset helical unit was showing signs of possible failure. This was...</description><pubDate>Fri, 18 Jun 2010 00:00:00 GMT</pubDate><category>ERIKS Geared up to Prevent Breakdown</category></item><item><title>ERIKS + AJS, a one-stop-shop motor gear solution</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_34.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_34.pdf</guid><description>AJS (part of the Hargreaves group) approached ERIKS for help with a motor gear installation as part of a project they were involved ...</description><pubDate>Fri, 18 Jun 2010 00:00:00 GMT</pubDate><category>ERIKS + AJS, a one-stop-shop motor gear solution</category></item><item><title>ERIKS Tame Trouble with Paper Mill Tandem Drives</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_32.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_32.pdf</guid><description>Russell Horrigan (ERIKS Technology Centre - Drives) was called to a paper mill in Kent where there had been a single drive failu...</description><pubDate>Fri, 18 Jun 2010 00:00:00 GMT</pubDate><category>ERIKS Tame Trouble with Paper Mill Tandem Drives</category></item><item><title>SMSR Breakdown Repair Service</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_31.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_31.pdf</guid><description>Late one Friday evening the Drives Technology Centre, based in Dudley, received a delivery of two Fenner Shaft Mounted Speed Reducer...</description><pubDate>Fri, 18 Jun 2010 00:00:00 GMT</pubDate><category>SMSR Breakdown Repair Service</category></item><item><title>New Drive Design Yields Savings</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_30.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_30.pdf</guid><description>The drier drum at this site is rotated using four worn and obsolete drives. This old technology included inefficient worm gearboxes, and...</description><pubDate>Fri, 18 Jun 2010 00:00:00 GMT</pubDate><category>New Drive Design Yields Savings</category></item><item><title>Uprated Fenner SMSR Reduces Downtime</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_27.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_27.pdf</guid><description>Emergency breakdown. Following an onsite inspection by ERIKS application engineers it was noted that the current SMSR gearboxes were undersi...</description><pubDate>Fri, 18 Jun 2010 00:00:00 GMT</pubDate><category>Uprated Fenner SMSR Reduces Downtime</category></item><item><title>Fenner Gearbox Keeps Train on Track</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_26.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_26.pdf</guid><description>Major gearbox breakdown on rail conveyor whilst unloading 1,400 ton of limestone from wagons....</description><pubDate>Fri, 18 Jun 2010 00:00:00 GMT</pubDate><category>Fenner Gearbox Keeps Train on Track</category></item><item><title>Fenner Gearbox Solves Breakdown</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_25.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_25.pdf</guid><description>Regular failures of David Brown A1600 worm gearbox on a skip car traverse drive....</description><pubDate>Fri, 18 Jun 2010 00:00:00 GMT</pubDate><category>Fenner Gearbox Solves Breakdown</category></item><item><title>Cost Savings through Energy Reduction</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_24.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_24.pdf</guid><description>We focused our attention on the aggregate drying application. The dryer exhaust fan, powered by a 240kW electric motor is used to draw h...</description><pubDate>Fri, 18 Jun 2010 00:00:00 GMT</pubDate><category>Cost Savings through Energy Reduction</category></item><item><title>Cost Savings Through Energy Reduction</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_23.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_23.pdf</guid><description>This Asphalt Plant utilises a Reverse Flow Bag House to contain dust from the drier extraction. The reverse flow control is in place to prol...</description><pubDate>Fri, 18 Jun 2010 00:00:00 GMT</pubDate><category>Cost Savings Through Energy Reduction</category></item><item><title>Breakdown Crisis Averted with Fenner Series K</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_22.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_22.pdf</guid><description>The Gateshead service centre were contacted at 11.30am with details of a breakdown situation, a failed gearmotor drive unit (Nord&amp;#4...</description><pubDate>Fri, 18 Jun 2010 00:00:00 GMT</pubDate><category>Breakdown Crisis Averted with Fenner Series K</category></item><item><title>Impartial Solutions Increase Plant Productivity</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_21.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_21.pdf</guid><description>Severe dust ingress was causing premature failure on motors drawn from stock, resulting in lost production at one British Gypsum site. N...</description><pubDate>Fri, 18 Jun 2010 00:00:00 GMT</pubDate><category>Impartial Solutions Increase Plant Productivity</category></item><item><title>Thermal Imaging Energy Survey Reveals Cost Savings</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_20.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_20.pdf</guid><description>The new ERIKS thermography department based in Tyseley, Birmingham has achieved a notable success in offering the Coors brewery in Burto...</description><pubDate>Thu, 17 Jun 2010 00:00:00 GMT</pubDate><category>Thermal Imaging Energy Survey Reveals Cost Savings</category></item><item><title>Exhaust Fan Drive Replacement Saves Energy</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_19.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_19.pdf</guid><description>After an internal energy review by a large aggregate company and the second largest producer of asphalt in the UK, exhaust fans at six o...</description><pubDate>Thu, 17 Jun 2010 00:00:00 GMT</pubDate><category>Exhaust Fan Drive Replacement Saves Energy</category></item><item><title>Pressure Control Drives Reduce Energy Wastage</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_18.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_18.pdf</guid><description>A major automotive gearbox manufacturer called upon ERIKS to conduct an energy survey of the machine tool coolant circuits, which feed t...</description><pubDate>Thu, 17 Jun 2010 00:00:00 GMT</pubDate><category>Pressure Control Drives Reduce Energy Wastage</category></item><item><title>Fan Drive Replacement Proves Energy Efficient</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_17.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_17.pdf</guid><description>An essential part of the production line at an Aluminium Smelting site in Cumbria is a large process fan that operates 24 hrs per day. Drive...</description><pubDate>Thu, 17 Jun 2010 00:00:00 GMT</pubDate><category>Fan Drive Replacement Proves Energy Efficient</category></item><item><title>Filtration System Aids Regulatory Compliance</title><link>http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_16.pdf</link><guid isPermaLink="false">http://www.eriks.co.uk/data/casestudies/pdfs/cspdf_16.pdf</guid><description>Torbay Hospital were paying on average 250 per week to remove oil-contaminated water from an area around oil storage tanks. Had th...</description><pubDate>Thu, 17 Jun 2010 00:00:00 GMT</pubDate><category>Filtration System Aids Regulatory Compliance</category></item>
  </channel>
</rss>

